HTS Heading 8537

Boards, panels, consoles, desks, cabinets and other bases, equipped with two or more apparatus of heading 8535 or 8536, for electric control or the distribution of electricity, including those incorporating instruments or apparatus of chapter 90, and numerical control apparatus, other than switching apparatus of heading 8517

All 10 HTS codes under heading 8537 (boards, panels, consoles, desks), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.7%.

Every line of heading 8537

  • 8537 Boards, panels, consoles, desks, cabinets and other bases, equipped with two or more apparatus of heading 8535 or 8536, for electric control or the distribution of electricity, including those incorporating instruments or apparatus of chapter 90, and numerical control apparatus, other than switching apparatus of heading 8517.
  • 8537.10 For a voltage not exceeding 1,000 V.
  • 8537.10.30.00 Assembled with outer housing or supports, for the goods of headings 8421, 8422, 8450 or 8516 (No.): General 2.7%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8537.10.60.00 Motor control centers (under: For a voltage not exceeding 1,000 V) (No.): General 2.7%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8537.10.80.00 Touch-sensitive data input devices (so-called "touch screens") without display capabilities, for incorporation into apparatus having a display, which function by detecting the presence and location of a touch within the display area (such sensing may be obtained by means of resistance, electrostatic capacity, acoustic pulse recognition, infra-red lights or other touch-sensitive technology) (No.): General Free; Special none; Column 2 35%.
  • 8537.10.91 Other (under: Other): General 2.7%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8537.10.91.20 Switchgear assemblies and switchboards (No.).
  • 8537.10.91.30 Numerical controls for controlling machine tools (No.).
  • 8537.10.91.50 Panel boards and distribution boards (No.).
  • 8537.10.91.60 Programmable controllers (under: Other) (No.).
  • 8537.10.91.70 Other (under: Other) (No.).
  • 8537.20.00 For a voltage exceeding 1,000 V: General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8537.20.00.20 Switchgear assemblies and switchboards (No.).
  • 8537.20.00.40 Other (under: For a voltage exceeding 1,000 V) (No.).

From MFG Calcs data: Switchgear, connectors, and controls

U.S. imports of switchgear, connectors, and controls (headings 8535, 8536, 8537, 8538) came to $42.13B in 2025, with $4.72B in calculated duty: an effective duty of 11.2%, every duty included.

Effective duty in Sep 2026: 10.2%, against 14.4% in Sep 2025.

Largest sources in 2025: Mexico $15.68B at 3.7% effective duty; China $3.54B at 50.9% effective duty; Canada $2.75B at 3.1% effective duty; Germany $2.60B at 10.9% effective duty; Japan $1.75B at 10.4% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.