HTS Heading 8549
Electrical and electronic waste and scrap
All 14 HTS codes under heading 8549 (electrical and electronic waste and scrap), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8549
- 8549 Electrical and electronic waste and scrap.
- 8549.11 Waste and scrap of lead-acid accumulators; spent lead-acid accumulators.
- 8549.11.10 For recovery of lead (under: Waste and scrap of lead-acid accumulators; spent lead-acid accumulators): General Free; Special none; Column 2 11.5%.
- 8549.11.10.40 Lead-acid storage batteries, of a kind used for starting engines (No., kg).
- 8549.11.10.80 Other (under: For recovery of lead) (No., kg).
- 8549.11.90.00 Other (under: Waste and scrap of lead-acid accumulators; spent lead-acid accumulators) (kg): General Free; Special none; Column 2 Free.
- 8549.12 Other, containing lead, cadmium or mercury.
- 8549.12.40.00 For recovery of lead (under: Other, containing lead, cadmium or mercury) (No., kg): General Free; Special none; Column 2 11.5%.
- 8549.12.80.00 Other (under: Other, containing lead, cadmium or mercury) (kg): General Free; Special none; Column 2 Free.
- 8549.13.00.00 Sorted by chemical type and not containing lead, cadmium or mercury (kg): General Free; Special none; Column 2 Free.
- 8549.14.00.00 Unsorted and not containing lead, cadmium or mercury (kg): General Free; Special none; Column 2 Free.
- 8549.19.00.00 Other (under: Waste and scrap of primary cells, primary batteries and electric accumulators; spent primary cells, spent primary batteries and spent electric accumulators) (kg): General Free; Special none; Column 2 Free.
- 8549.21.00.00 Containing primary cells, primary batteries, electric accumulators, mercury-switches, glass from cathode-ray tubes or other activated glass, or electrical or electronic components containing cadmium, mercury, lead or polychlorinated biphenyls (PCBs) (kg): General Free; Special none; Column 2 Free.
- 8549.29.00.00 Other (under: Of a kind used principally for the recovery of precious metal) (kg): General Free; Special none; Column 2 Free.
- 8549.31.00.00 Containing primary cells, primary batteries, electric accumulators, mercury-switches, glass from cathode-ray tubes or other activated glass, or electrical or electronic components containing cadmium, mercury, lead or polychlorinated biphenyls (PCBs) (kg): General Free; Special none; Column 2 Free.
- 8549.39.00.00 Other (under: Other electrical and electronic assemblies and printed circuit boards) (kg): General Free; Special none; Column 2 Free.
- 8549.91.00.00 Containing primary cells, primary batteries, electric accumulators, mercury-switches, glass from cathode-ray tubes or other activated glass, or electrical or electronic components containing cadmium, mercury, lead or polychlorinated biphenyls (PCBs) (kg): General Free; Special none; Column 2 Free.
- 8549.99.00.00 Other (under: Other) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.