HTS Heading 8601

Rail locomotives powered from an external source of electricity or by electric accumulators (batteries)

All 2 HTS codes under heading 8601 (rail locomotives powered from an external source), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8601

  • 8601 Rail locomotives powered from an external source of electricity or by electric accumulators (batteries).
  • 8601.10.00.00 Powered from an external source of electricity (No.): General Free; Special none; Column 2 35%.
  • 8601.20.00.00 Powered by electric accumulators (batteries) (No.): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.