HTS Heading 8905
Light-vessels, fire-floats, dredgers, floating cranes, and other vessels the navigability of which is subsidiary to their main function; floating docks; floating or submersible drilling or production platforms
All 4 HTS codes under heading 8905 (light-vessels, fire-floats, dredgers), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8905
- 8905 Light-vessels, fire-floats, dredgers, floating cranes, and other vessels the navigability of which is subsidiary to their main function; floating docks; floating or submersible drilling or production platforms.
- 8905.10.00.00 Dredgers (under: Light-vessels, fire-floats, dredgers, floating cranes, and other vessels the navigability of which is subsidiary to their main function; floating docks; floating or submersible drilling or production platforms) (No.): General Free; Special none; Column 2 Free.
- 8905.20.00.00 Floating or submersible drilling or production platforms (t, No.): General Free; Special none; Column 2 Free.
- 8905.90 Other (under: Light-vessels, fire-floats, dredgers, floating cranes, and other vessels the navigability of which is subsidiary to their main function; floating docks; floating or submersible drilling or production platforms).
- 8905.90.10.00 Floating docks (under: Other) (t, No.): General Free; Special none; Column 2 35%.
- 8905.90.50.00 Other (under: Other) (No.): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.