HTS Heading 8906

Other vessels, including warships and lifeboats other than row boats

All 3 HTS codes under heading 8906 (other vessels), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8906

  • 8906 Other vessels, including warships and lifeboats other than row boats.
  • 8906.10.00.00 Warships (under: Other vessels, including warships and lifeboats other than row boats) (No.): General Free; Special none; Column 2 Free.
  • 8906.90.00 Other (under: Other vessels, including warships and lifeboats other than row boats): General Free; Special none; Column 2 Free.
  • 8906.90.00.10 Hulls (under: Other) (t, No.).
  • 8906.90.00.90 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.