HTS Heading 8907
Other floating structures (for example, rafts, tanks, cofferdams, landing-stages, buoys and beacons)
All 4 HTS codes under heading 8907 (other floating structures), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8907
- 8907 Other floating structures (for example, rafts, tanks, cofferdams, landing-stages, buoys and beacons).
- 8907.10.00.00 Inflatable rafts (under: Other floating structures (for example, rafts, tanks, cofferdams, landing-stages, buoys and beacons)) (No.): General Free; Special none; Column 2 45%.
- 8907.90.00 Other (under: Other floating structures (for example, rafts, tanks, cofferdams, landing-stages, buoys and beacons)): General Free; Special none; Column 2 45%.
- 8907.90.00.30 Buoys (under: Other) (No.).
- 8907.90.00.60 Tanks (under: Other) (No.).
- 8907.90.00.90 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.