HTS Heading 9002
Lenses, prisms, mirrors and other optical elements, of any material, mounted, being parts of or fittings for instruments or apparatus, other than such elements of glass not optically worked; parts and accessories thereof
All 11 HTS codes under heading 9002 (lenses, prisms), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.45%.
Every line of heading 9002
- 9002 Lenses, prisms, mirrors and other optical elements, of any material, mounted, being parts of or fittings for instruments or apparatus, other than such elements of glass not optically worked; parts and accessories thereof.
- 9002.11 For cameras, projectors or photographic enlargers or reducers.
- 9002.11.40.00 Projection (under: For cameras, projectors or photographic enlargers or reducers) (No.): General 2.45%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9002.11.60.00 Mounted lenses suitable for use in, and entered separately from, closed-circuit television cameras, with or without attached electrical or non-electrical closed-circuit television camera connectors, and with or without attached motors (No.): General Free; Special none; Column 2 45%.
- 9002.11.90.00 Other (under: Other) (No.): General 2.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9002.19.00.00 Other (under: Objective lenses and parts and accessories thereof) (No.): General Free; Special none; Column 2 45%.
- 9002.20 Filters and parts and accessories thereof.
- 9002.20.40.00 Photographic (under: Filters and parts and accessories thereof) (No.): General Free; Special none; Column 2 20%.
- 9002.20.80.00 Other (under: Filters and parts and accessories thereof) (No.): General Free; Special none; Column 2 65%.
- 9002.90 Other (under: Lenses, prisms, mirrors and other optical elements, of any material, mounted, being parts of or fittings for instruments or apparatus, other than such elements of glass not optically worked; parts and accessories thereof).
- 9002.90.20.00 Prisms (under: Other) (No.): General Free; Special none; Column 2 65%.
- 9002.90.40.00 Mirrors (under: Other) (No.): General Free; Special none; Column 2 45%.
- 9002.90.70.00 Halftone screens designed for use in engraving or photographic processes (No.): General Free; Special none; Column 2 25%.
- 9002.90.85.00 Mounted lenses suitable for use in, and entered separately from, closed-circuit television cameras, with or without attached electrical or non-electrical closed-circuit television camera connectors, and with or without attached motors (No.): General Free; Special none; Column 2 65%.
- 9002.90.95.00 Other (under: Other) (No.): General Free; Special none; Column 2 65%.
From MFG Calcs data: Optical elements and lenses
U.S. imports of optical elements and lenses (headings 9001, 9002) came to $4.36B in 2025, with $566M in calculated duty: an effective duty of 13.0%, every duty included.
Effective duty in Sep 2026: 13.7%, against 18.0% in Sep 2025.
Largest sources in 2025: Japan $729M at 9.8% effective duty; Mexico $534M at 3.7% effective duty; Germany $515M at 9.8% effective duty; China $372M at 48.0% effective duty; Ireland $367M at 9.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.