HTS Heading 9003

Frames and mountings for spectacles, goggles or the like, and parts thereof

All 3 HTS codes under heading 9003 (frames and mountings for spectacles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.5%.

Every line of heading 9003

  • 9003 Frames and mountings for spectacles, goggles or the like, and parts thereof.
  • 9003.11.00.00 Of plastics (under: Frames and mountings) (doz.): General 2.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 9003.19.00.00 Of other materials (under: Frames and mountings) (doz.): General Free; Special none; Column 2 50%.
  • 9003.90.00.00 Parts (under: Frames and mountings for spectacles, goggles or the like, and parts thereof) (No.): General 2.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.