HTS Heading 9004
Spectacles, goggles and the like, corrective, protective or other
All 3 HTS codes under heading 9004 (spectacles, goggles and the like, corrective), with their duty rates from the 2026 HTS Revision 23. General duty 2% to 2.5%.
Every line of heading 9004
- 9004 Spectacles, goggles and the like, corrective, protective or other.
- 9004.10.00.00 Sunglasses (under: Spectacles, goggles and the like, corrective, protective or other) (doz.): General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9004.90.00 Other (under: Spectacles, goggles and the like, corrective, protective or other): General 2.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9004.90.00.10 Safety glasses or safety goggles (doz.).
- 9004.90.00.90 Other (under: Other) (doz.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.