HTS Heading 9006
Photographic (other than cinematographic) cameras; photographic flashlight apparatus and flashbulbs other than discharge lamps of heading 8539; parts and accessories thereof
All 32 HTS codes under heading 9006 (photographic), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.8%.
Every line of heading 9006
- 9006 Photographic (other than cinematographic) cameras; photographic flashlight apparatus and flashbulbs other than discharge lamps of heading 8539; parts and accessories thereof.
- 9006.30.00.00 Cameras specially designed for underwater use, for aerial survey, or for medical or surgical examination of internal organs; comparison cameras for forensic or criminological purposes (No.): General Free; Special none; Column 2 20%.
- 9006.40 Instant print cameras (under: Photographic (other than cinematographic) cameras; photographic flashlight apparatus and flashbulbs other than discharge lamps of heading 8539; parts and accessories thereof).
- 9006.40.40.00 Fixed focus (under: Instant print cameras) (No.): General Free; Special none; Column 2 20%.
- 9006.40.60.00 Valued not over $10 each (under: Other than fixed focus) (No.): General 6.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 9006.40.90.00 Valued over $10 each (under: Other than fixed focus) (No.): General Free; Special none; Column 2 20%.
- 9006.53.02 For roll film of a width of 35 mm: General Free; Special none; Column 2 20%.
- 9006.53.02.05 With through-the-lens viewfinder (single lens reflex (SLR)) (No.).
- 9006.53.02.10 With built-in electronic stroboscopic flash (No.).
- 9006.53.02.20 Other (under: One time use cameras) (No.).
- 9006.53.02.50 With built-in electronic stroboscopic flash (No.).
- 9006.53.02.70 Other (under: Other) (No.).
- 9006.59 Other (under: Other cameras).
- 9006.59.01 With through-the-lens viewfinder (single lens reflex (SLR)): General Free; Special none; Column 2 20%.
- 9006.59.01.60 For magnetically sensitized roll film of a width of 24 mm (No.).
- 9006.59.01.90 Other (under: With through-the-lens viewfinder (single lens reflex (SLR))) (No.).
- 9006.59.05 110 cameras (under: Hand held): General Free; Special none; Column 2 20%.
- 9006.59.05.20 With built-in electronic stroboscopic flash (No.).
- 9006.59.05.40 Other (under: 110 cameras) (No.).
- 9006.59.08.00 Other (under: Hand held) (No.): General 4%; Special Free(A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 9006.59.10.00 Other (under: Fixed focus) (No.): General Free; Special none; Column 2 20%.
- 9006.59.12.00 Valued not over $10 each (under: Other than fixed focus) (No.): General 6.8%; Special Free(A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 9006.59.15 Valued over $10 each (under: Other than fixed focus): General Free; Special none; Column 2 20%.
- 9006.59.15.20 With built-in electronic stroboscopic flash (No.).
- 9006.59.15.40 Other (under: 110 cameras) (No.).
- 9006.59.15.60 Other (under: Hand held) (No.).
- 9006.59.15.80 Other (under: Valued over $10 each) (No.).
- 9006.59.20.00 Cameras of a kind used for preparing printing plates or cylinders (No.): General Free; Special none; Column 2 20%.
- 9006.59.40 Fixed focus (under: Other): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 9006.59.40.40 Disc cameras (under: Fixed focus) (No.).
- 9006.59.40.60 Other (under: Fixed focus) (No.).
- 9006.59.60.00 Valued not over $10 each (under: Other than fixed focus) (No.): General 6.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 9006.59.91.00 Valued over $10 each (under: Other than fixed focus) (No.): General Free; Special none; Column 2 20%.
- 9006.61.00 Discharge lamp ("electronic") flashlight apparatus: General Free; Special none; Column 2 35%.
- 9006.61.00.20 Capable of automatically controlling flash duration (No.).
- 9006.61.00.40 Other (under: Capable of camera mounting) (No.).
- 9006.61.00.60 Other (under: Discharge lamp ("electronic") flashlight apparatus) (No.).
- 9006.69.01 Other (under: Photographic flashlight apparatus and flashbulbs): General Free; Special none; Column 2 35%.
- 9006.69.01.10 Flashbulbs, flashcubes and the like (No.).
- 9006.69.01.50 Other (under: Other) (No.).
- 9006.91.00.01 For cameras (under: Parts and accessories) (No.): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 9006.99.00.00 Other (under: Parts and accessories) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.