HTS Heading 9007

Cinematographic cameras and projectors, whether or not incorporating sound recording or reproducing apparatus; parts and accessories thereof

All 9 HTS codes under heading 9007 (cinematographic cameras and projectors), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.9%.

Every line of heading 9007

  • 9007 Cinematographic cameras and projectors, whether or not incorporating sound recording or reproducing apparatus; parts and accessories thereof.
  • 9007.10.00.00 Cameras (under: Cinematographic cameras and projectors, whether or not incorporating sound recording or reproducing apparatus; parts and accessories thereof) (No.): General Free; Special none; Column 2 20%.
  • 9007.20 Projectors (under: Cinematographic cameras and projectors, whether or not incorporating sound recording or reproducing apparatus; parts and accessories thereof).
  • 9007.20.20.00 With sound recording and reproducing systems; and those capable of projecting only sound motion pictures (No.): General Free; Special none; Column 2 45%.
  • 9007.20.40.00 Other (under: For film of less than 16 mm) (No.): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9007.20.60 With sound recording and reproducing systems; and those capable of projecting only sound motion pictures: General Free; Special none; Column 2 45%.
  • 9007.20.60.40 16 mm (under: With sound recording and reproducing systems; and those capable of projecting only sound motion pictures) (No.).
  • 9007.20.60.80 Other (under: With sound recording and reproducing systems; and those capable of projecting only sound motion pictures) (No.).
  • 9007.20.80.00 Other (under: Other) (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9007.91 For cameras (under: Parts and accessories).
  • 9007.91.40.00 Parts (under: For cameras) (kg): General Free; Special none; Column 2 20%.
  • 9007.91.80.01 Other (under: For cameras) (kg): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9007.92.00.00 For projectors (under: Parts and accessories) (kg): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.