HTS Heading 9012
Microscopes other than optical microscopes; diffraction apparatus; parts and accessories thereof
All 2 HTS codes under heading 9012 (microscopes other than optical microscopes), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 9012
- 9012 Microscopes other than optical microscopes; diffraction apparatus; parts and accessories thereof.
- 9012.10.00.00 Microscopes other than optical microscopes; diffraction apparatus (No.): General Free; Special none; Column 2 40%.
- 9012.90.00.00 Parts and accessories (under: Microscopes other than optical microscopes; diffraction apparatus; parts and accessories thereof) (kg): General Free; Special none; Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.