HTS Heading 9011

Compound optical microscopes, including those for photomicrography, cinemicrography or microprojection; parts and accessories thereof

All 6 HTS codes under heading 9011 (compound optical microscopes), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.2%.

Every line of heading 9011

  • 9011 Compound optical microscopes, including those for photomicrography, cinemicrography or microprojection; parts and accessories thereof.
  • 9011.10 Stereoscopic microscopes (under: Compound optical microscopes, including those for photomicrography, cinemicrography or microprojection; parts and accessories thereof).
  • 9011.10.40.00 Provided with a means for photographing the image (No.): General Free; Special none; Column 2 20%.
  • 9011.10.80.00 Other (under: Stereoscopic microscopes) (No.): General Free; Special none; Column 2 45%.
  • 9011.20 Other microscopes, for photomicrography, cinemicrography or microprojection.
  • 9011.20.40.00 Provided with a means for photographing the image (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 9011.20.80.00 Other (under: Other microscopes, for photomicrography, cinemicrography or microprojection) (No.): General 7.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9011.80.00.00 Other microscopes (under: Compound optical microscopes, including those for photomicrography, cinemicrography or microprojection; parts and accessories thereof) (No.): General Free; Special none; Column 2 45%.
  • 9011.90.00.00 Parts and accessories (under: Compound optical microscopes, including those for photomicrography, cinemicrography or microprojection; parts and accessories thereof) (kg): General Free; Special none; Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.