HTS Heading 9014
Direction finding compasses; other navigational instruments and appliances; parts and accessories thereof
All 19 HTS codes under heading 9014 (direction finding compasses), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 9014
- 9014 Direction finding compasses; other navigational instruments and appliances; parts and accessories thereof.
- 9014.10 Direction finding compasses (under: Direction finding compasses; other navigational instruments and appliances; parts and accessories thereof).
- 9014.10.10.00 Optical instruments (under: Direction finding compasses) (No.): General Free; Special none; Column 2 45%.
- 9014.10.60.00 Gyroscopic compasses, other than electrical (No.): General Free; Special none; Column 2 35%.
- 9014.10.70 Electrical (under: Other): General Free; Special none; Column 2 40%.
- 9014.10.70.30 Gyroscopic compasses (under: Electrical) (No.).
- 9014.10.70.60 Other (under: Electrical) (No.).
- 9014.10.90.00 Other (under: Other) (No.): General Free; Special none; Column 2 45%.
- 9014.20 Instruments and appliances for aeronautical or space navigation (other than compasses).
- 9014.20.20.00 Optical instruments and appliances (No.): General Free; Special none; Column 2 45%.
- 9014.20.40.00 Automatic pilots (under: Other) (No.): General Free; Special none; Column 2 40%.
- 9014.20.60.00 Electrical (under: Other) (No.): General Free; Special none; Column 2 40%.
- 9014.20.80 Other (under: Other): General Free; Special none; Column 2 30%.
- 9014.20.80.40 For use in civil aircraft (under: Other) (No.).
- 9014.20.80.80 Other (under: Other) (No.).
- 9014.80 Other instruments and appliances.
- 9014.80.10.00 Optical instruments (under: Other instruments and appliances) (No.): General Free; Special none; Column 2 45%.
- 9014.80.20.00 Ships' logs and depth-sounding apparatus (No.): General Free; Special none; Column 2 70%.
- 9014.80.40.00 Electrical (under: Other) (No.): General Free; Special none; Column 2 40%.
- 9014.80.50.00 Other (under: Other) (No.): General Free; Special none; Column 2 30%.
- 9014.90 Parts and accessories (under: Direction finding compasses; other navigational instruments and appliances; parts and accessories thereof).
- 9014.90.10.00 Of articles covered by subheading 9014.20.40 (kg): General Free; Special none; Column 2 40%.
- 9014.90.20 Of articles covered by subheading 9014.20.80: General Free; Special none; Column 2 30%.
- 9014.90.20.40 For use in civil aircraft (under: Of articles covered by subheading 9014.20.80) (No.).
- 9014.90.20.80 Other (under: Of articles covered by subheading 9014.20.80) (No.).
- 9014.90.40.00 Of articles covered by subheading 9014.80.50 (kg): General Free; Special none; Column 2 30%.
- 9014.90.60.00 Other (under: Parts and accessories) (kg): General Free; Special none; Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.