HTS Heading 9015

Surveying (including photogrammetrical surveying), hydrographic, oceanographic, hydrological, meteorological or geophysical instruments and appliances, excluding compasses; rangefinders; parts and accessories thereof

All 19 HTS codes under heading 9015 (surveying), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.8%.

Every line of heading 9015

  • 9015 Surveying (including photogrammetrical surveying), hydrographic, oceanographic, hydrological, meteorological or geophysical instruments and appliances, excluding compasses; rangefinders; parts and accessories thereof.
  • 9015.10 Rangefinders (under: Surveying (including photogrammetrical surveying), hydrographic, oceanographic, hydrological, meteorological or geophysical instruments and appliances, excluding compasses; rangefinders; parts and accessories thereof).
  • 9015.10.40.00 Electrical (under: Rangefinders) (No.): General Free; Special none; Column 2 40%.
  • 9015.10.80.00 Other (under: Rangefinders) (No.): General Free; Special none; Column 2 45%.
  • 9015.20 Theodolites and tachymeters (tacheometers).
  • 9015.20.40.00 Electrical (under: Theodolites and tachymeters (tacheometers)) (No.): General Free; Special none; Column 2 40%.
  • 9015.20.80.00 Other (under: Theodolites and tachymeters (tacheometers)) (No.): General Free; Special none; Column 2 45%.
  • 9015.30 Levels (under: Surveying (including photogrammetrical surveying), hydrographic, oceanographic, hydrological, meteorological or geophysical instruments and appliances, excluding compasses; rangefinders; parts and accessories thereof).
  • 9015.30.40.00 Electrical (under: Levels) (No.): General Free; Special none; Column 2 40%.
  • 9015.30.80.00 Other (under: Levels) (No.): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9015.40 Photogrammetrical surveying instruments and appliances.
  • 9015.40.40.00 Electrical (under: Photogrammetrical surveying instruments and appliances) (No.): General Free; Special none; Column 2 40%.
  • 9015.40.80.00 Other (under: Photogrammetrical surveying instruments and appliances) (No.): General Free; Special none; Column 2 40%.
  • 9015.80 Other instruments and appliances.
  • 9015.80.20.00 Optical instruments and appliances (No.): General Free; Special none; Column 2 45%.
  • 9015.80.60.00 Seismographs (under: Other) (No.): General Free; Special none; Column 2 40%.
  • 9015.80.80 Other (under: Other): General Free; Special none; Column 2 40%.
  • 9015.80.80.40 Geophysical instruments and appliances (No.).
  • 9015.80.80.80 Other (under: Other) (kg).
  • 9015.90.01 Parts and accessories (under: Surveying (including photogrammetrical surveying), hydrographic, oceanographic, hydrological, meteorological or geophysical instruments and appliances, excluding compasses; rangefinders; parts and accessories thereof): General Free; Special none; Column 2 The rate applicable to the article of which it is a part or accessory.
  • 9015.90.01.10 Of rangefinders (under: Parts and accessories) (kg).
  • 9015.90.01.20 Of theodolites and tachymeters (kg).
  • 9015.90.01.30 Of levels (under: Parts and accessories) (kg).
  • 9015.90.01.40 Of photogrammetrical surveying instruments and apparatus (kg).
  • 9015.90.01.50 Of seismographs (under: Parts and accessories) (kg).
  • 9015.90.01.60 Of other geophysical instruments and appliances (kg).
  • 9015.90.01.90 Other (under: Parts and accessories) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.