HTS Heading 9017

Drawing, marking-out or mathematical calculating instruments (for example, drafting machines, pantographs, protractors, drawing sets, slide rules, disc calculators); instruments for measuring length, for use in the hand (for example, measuring rods and tapes, micrometers, calipers), not specified or included elsewhere in this chapter; parts and accessories thereof

All 17 HTS codes under heading 9017 (drawing), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.8%.

Every line of heading 9017

  • 9017 Drawing, marking-out or mathematical calculating instruments (for example, drafting machines, pantographs, protractors, drawing sets, slide rules, disc calculators); instruments for measuring length, for use in the hand (for example, measuring rods and tapes, micrometers, calipers), not specified or included elsewhere in this chapter; parts and accessories thereof.
  • 9017.10 Drafting tables and machines, whether or not automatic.
  • 9017.10.40.00 Plotters (under: Drafting tables and machines, whether or not automatic) (No.): General Free; Special none; Column 2 45%.
  • 9017.10.80.00 Other (under: Drafting tables and machines, whether or not automatic) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9017.20 Other drawing, marking-out or mathematical calculating instruments.
  • 9017.20.40.00 Disc calculators, slide rules and other mathematical calculating instruments (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9017.20.70.00 Plotters (under: Other drawing, marking-out or mathematical calculating instruments) (No.): General Free; Special none; Column 2 45%.
  • 9017.20.80 Other (under: Other drawing, marking-out or mathematical calculating instruments): General 4.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9017.20.80.40 Hand operated input devices which transmit position data to computer processors or displays (digitizers) (No.).
  • 9017.20.80.80 Other (under: Other) (kg).
  • 9017.30 Micrometers, calipers and gauges.
  • 9017.30.40.00 Micrometers and calipers (under: Micrometers, calipers and gauges) (No.): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9017.30.80.00 Other (under: Micrometers, calipers and gauges) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9017.80.00.00 Other instruments (under: Drawing, marking-out or mathematical calculating instruments (for example, drafting machines, pantographs, protractors, drawing sets, slide rules, disc calculators); instruments for measuring length, for use in the hand (for example, measuring rods and tapes, micrometers, calipers), not specified or included elsewhere in this chapter; parts and accessories thereof) (No.): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 2.65%(JP); Column 2 45%.
  • 9017.90.01 Parts and accessories (under: Drawing, marking-out or mathematical calculating instruments (for example, drafting machines, pantographs, protractors, drawing sets, slide rules, disc calculators); instruments for measuring length, for use in the hand (for example, measuring rods and tapes, micrometers, calipers), not specified or included elsewhere in this chapter; parts and accessories thereof): General The rate applicable to the article of which it is a part or accessory; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to the article of which it is a part or accessory.
  • 9017.90.01.05 Of articles of subheading 9017.10.40 (kg).
  • 9017.90.01.15 Of articles of subheading 9017.10.80 (kg).
  • 9017.90.01.20 Of articles of subheading 9017.20.40 (kg).
  • 9017.90.01.32 Of articles of subheading 9017.20.70 (kg).
  • 9017.90.01.36 Of articles of subheading 9017.20.80 (kg).
  • 9017.90.01.40 Of articles of subheading 9017.30.40 (kg).
  • 9017.90.01.50 Of articles of subheading 9017.30.80 (kg).
  • 9017.90.01.60 Other (under: Parts and accessories) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.