HTS Heading 9016
Balances of a sensitivity of 5 cg or better, with or without weights; parts and accessories thereof
All 3 HTS codes under heading 9016 (balances of a sensitivity of 5 cg), with their duty rates from the 2026 HTS Revision 23. General duty 2.9% to 3.9%.
Every line of heading 9016
- 9016.00 Balances of a sensitivity of 5 cg or better, with or without weights; parts and accessories thereof.
- 9016.00.20.00 Electrical balances and parts and accessories thereof (kg): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9016.00.40.00 Jewelers' balances and parts and accessories thereof (kg): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9016.00.60.00 Other (under: Other) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.