HTS Heading 9019
Mechano-therapy appliances; massage apparatus; psychological aptitude-testing apparatus; ozone therapy, oxygen therapy, aerosol therapy, artificial respiration or other therapeutic respiration apparatus; parts and accessories thereof
All 10 HTS codes under heading 9019 (mechano-therapy appliances), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 9019
- 9019 Mechano-therapy appliances; massage apparatus; psychological aptitude-testing apparatus; ozone therapy, oxygen therapy, aerosol therapy, artificial respiration or other therapeutic respiration apparatus; parts and accessories thereof.
- 9019.10 Mechano-therapy appliances; massage apparatus; psychological aptitude-testing apparatus; parts and accessories thereof.
- 9019.10.20 Mechano-therapy appliances and massage apparatus; parts and accessories thereof: General Free; Special none; Column 2 35%.
- 9019.10.20.10 Mechano-therapy appliances (under: Mechano-therapy appliances and massage apparatus; parts and accessories thereof) (No.).
- 9019.10.20.20 Handheld (under: Battery powered) (No.).
- 9019.10.20.30 Other (under: Battery powered) (No.).
- 9019.10.20.35 Powered by AC adapter (under: Other) (No.).
- 9019.10.20.45 Other (under: Other) (No.).
- 9019.10.20.50 Other (under: Massage apparatus) (No.).
- 9019.10.20.90 Parts and accessories (under: Mechano-therapy appliances and massage apparatus; parts and accessories thereof) (No.).
- 9019.10.40.00 Electrically operated apparatus and parts thereof (No.): General Free; Special none; Column 2 35%.
- 9019.10.60.00 Other (under: Other) (No.): General Free; Special none; Column 2 55%.
- 9019.20.00.00 Ozone therapy, oxygen therapy, aerosol therapy, artificial respiration or other therapeutic respiration apparatus; parts and accessories thereof (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.