HTS Heading 9020

Other breathing appliances and gas masks, excluding protective masks having neither mechanical parts nor replaceable filters; parts and accessories thereof

All 3 HTS codes under heading 9020 (other breathing appliances and gas masks), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.5%.

Every line of heading 9020

  • 9020.00 Other breathing appliances and gas masks, excluding protective masks having neither mechanical parts nor replaceable filters; parts and accessories thereof.
  • 9020.00.40.00 Underwater breathing devices designed as a complete unit to be carried on the person and not requiring attendants (No.): General Free; Special none; Column 2 27.5%.
  • 9020.00.60.00 Other breathing appliances and gas masks (No.): General 2.5%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 9020.00.90.00 Other (under: Other breathing appliances and gas masks, excluding protective masks having neither mechanical parts nor replaceable filters; parts and accessories thereof) (kg): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.