HTS Heading 9026
Instruments and apparatus for measuring or checking the flow, level, pressure or other variables of liquids or gases (for example, flow meters, level gauges, manometers, heat meters), excluding instruments and apparatus of heading 9014, 9015, 9028 or 9032; parts and accessories thereof
All 12 HTS codes under heading 9026 (instruments and apparatus), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 9026
- 9026 Instruments and apparatus for measuring or checking the flow, level, pressure or other variables of liquids or gases (for example, flow meters, level gauges, manometers, heat meters), excluding instruments and apparatus of heading 9014, 9015, 9028 or 9032; parts and accessories thereof.
- 9026.10 For measuring or checking the flow or level of liquids.
- 9026.10.20 Electrical (under: For measuring or checking the flow or level of liquids): General Free; Special none; Column 2 40%.
- 9026.10.20.40 Flow meters (under: Electrical) (No.).
- 9026.10.20.80 Other (under: Electrical) (No.).
- 9026.10.40.00 Flow meters (under: Other) (No.): General Free; Special none; Column 2 $4.50 each + 65%.
- 9026.10.60.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
- 9026.20 For measuring or checking pressure.
- 9026.20.40.00 Electrical (under: For measuring or checking pressure) (No.): General Free; Special none; Column 2 40%.
- 9026.20.80.00 Other (under: For measuring or checking pressure) (No.): General Free; Special none; Column 2 35%.
- 9026.80 Other instruments and apparatus.
- 9026.80.20.00 Electrical (under: Other instruments and apparatus) (No.): General Free; Special none; Column 2 40%.
- 9026.80.40.00 Heat meters incorporating liquid supply meters, and anemometers (No.): General Free; Special none; Column 2 $4.50 each + 65%.
- 9026.80.60.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
- 9026.90 Parts and accessories (under: Instruments and apparatus for measuring or checking the flow, level, pressure or other variables of liquids or gases (for example, flow meters, level gauges, manometers, heat meters), excluding instruments and apparatus of heading 9014, 9015, 9028 or 9032; parts and accessories thereof).
- 9026.90.20.00 Of electrical instruments and apparatus (kg): General Free; Special none; Column 2 40%.
- 9026.90.40.00 Of flow meters, heat meters incorporating liquid supply meters and anemometers (kg): General Free; Special none; Column 2 65%.
- 9026.90.60.00 Other (under: Other) (kg): General Free; Special none; Column 2 35%.
From MFG Calcs data: Measuring and inspection instruments
U.S. imports of measuring and inspection instruments (headings 9026, 9031) came to $11.20B in 2025, with $1.14B in calculated duty: an effective duty of 10.2%, every duty included.
Effective duty in Sep 2026: 9.2%, against 15.0% in Sep 2025.
Largest sources in 2025: Mexico $1.93B at 3.0% effective duty; Germany $1.73B at 9.3% effective duty; Japan $1.15B at 8.3% effective duty; Canada $816M at 5.4% effective duty; China $760M at 44.0% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.