HTS Heading 9028

Gas, liquid or electricity supply or production meters, including calibrating meters thereof; parts and accessories thereof

All 5 HTS codes under heading 9028 (gas), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.5%, some per unit.

Every line of heading 9028

  • 9028 Gas, liquid or electricity supply or production meters, including calibrating meters thereof; parts and accessories thereof.
  • 9028.10.00.00 Gas meters (under: Gas, liquid or electricity supply or production meters, including calibrating meters thereof; parts and accessories thereof) (No.): General 16¢ each + 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65%.
  • 9028.20.00.00 Liquid meters (under: Gas, liquid or electricity supply or production meters, including calibrating meters thereof; parts and accessories thereof) (No.): General 16¢ each + 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65%.
  • 9028.30.00.00 Electricity meters (under: Gas, liquid or electricity supply or production meters, including calibrating meters thereof; parts and accessories thereof) (No.): General Free; Special none; Column 2 $4.50 each + 65%.
  • 9028.90.00 Parts and accessories (under: Gas, liquid or electricity supply or production meters, including calibrating meters thereof; parts and accessories thereof): General Free; Special none; Column 2 65%.
  • 9028.90.00.40 Of electricity meters (under: Parts and accessories) (kg).
  • 9028.90.00.80 Other (under: Parts and accessories) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.