HTS Heading 9029

Revolution counters, production counters, taximeters, odometers, pedometers and the like; speedometers and tachometers, other than those of heading 9014 or 9015; stroboscopes; parts and accessories thereof

All 11 HTS codes under heading 9029 (revolution counters), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%, some per unit.

Every line of heading 9029

  • 9029 Revolution counters, production counters, taximeters, odometers, pedometers and the like; speedometers and tachometers, other than those of heading 9014 or 9015; stroboscopes; parts and accessories thereof.
  • 9029.10 Revolution counters, production counters, taximeters, odometers, pedometers and the like.
  • 9029.10.40.00 Taximeters (under: Revolution counters, production counters, taximeters, odometers, pedometers and the like) (No.): General 5.3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 85%.
  • 9029.10.80.00 Other (under: Revolution counters, production counters, taximeters, odometers, pedometers and the like) (No.): General Free; Special none; Column 2 35%.
  • 9029.20 Speedometers and tachometers; stroboscopes.
  • 9029.20.20.00 Bicycle speedometers (under: Speedometers and tachometers; stroboscopes) (No.): General 6%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 110%.
  • 9029.20.40 Other speedometers and tachometers: General Free; Special none; Column 2 35%.
  • 9029.20.40.40 For use in civil aircraft (under: Other speedometers and tachometers) (No.).
  • 9029.20.40.80 Other (under: Other speedometers and tachometers) (No.).
  • 9029.20.60.00 Stroboscopes (under: Speedometers and tachometers; stroboscopes) (No.): General 16¢ each + 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65%.
  • 9029.90 Parts and accessories (under: Revolution counters, production counters, taximeters, odometers, pedometers and the like; speedometers and tachometers, other than those of heading 9014 or 9015; stroboscopes; parts and accessories thereof).
  • 9029.90.20.00 Of taximeters (under: Parts and accessories) (kg): General 5.3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 85%.
  • 9029.90.40.00 Of bicycle speedometers (under: Parts and accessories) (kg): General 6%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 110%.
  • 9029.90.60.00 Of stroboscopes (under: Parts and accessories) (kg): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 9029.90.80 Other (under: Parts and accessories): General Free; Special none; Column 2 35%.
  • 9029.90.80.40 Of speedometers and tachometers (kg).
  • 9029.90.80.80 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.