HTS Heading 9030

Oscilloscopes, spectrum analyzers and other instruments and apparatus for measuring or checking electrical quantities, excluding meters of heading 9028; instruments and apparatus for measuring or detecting alpha, beta, gamma, X-ray, cosmic or other ionizing radiations; parts and accessories thereof:​

All 25 HTS codes under heading 9030 (oscilloscopes), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.7%.

Every line of heading 9030

  • 9030 Oscilloscopes, spectrum analyzers and other instruments and apparatus for measuring or checking electrical quantities, excluding meters of heading 9028; instruments and apparatus for measuring or detecting alpha, beta, gamma, X-ray, cosmic or other ionizing radiations; parts and accessories thereof:​.
  • 9030.10.00.00 Instruments and apparatus for measuring or detecting ionizing radiations (No.): General Free; Special none; Column 2 40%.
  • 9030.20 Oscilloscopes and oscillographs.
  • 9030.20.05.00 Specially designed for telecommunications (No.): General Free; Special none; Column 2 40%.
  • 9030.20.10.00 Other oscilloscopes and oscillographs (No.): General Free; Special none; Column 2 40%.
  • 9030.31.00.00 Multimeters, without a recording device (No.): General Free; Special none; Column 2 40%.
  • 9030.32.00.00 Multimeters, with a recording device (No.): General Free; Special none; Column 2 40%.
  • 9030.33 Other, without a recording device.
  • 9030.33.34.00 Resistance measuring instruments (No.): General 1.7%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9030.33.38.00 Other (under: Other, without a recording device) (No.): General Free; Special none; Column 2 40%.
  • 9030.39.01.00 Other, with a recording device (No.): General Free; Special none; Column 2 40%.
  • 9030.40.00.00 Other instruments and apparatus, specially designed for telecommunications (for example, cross-talk meters, gain measuring instruments, distortion factor meters, psophometers) (No.): General Free; Special none; Column 2 40%.
  • 9030.82.00.00 For measuring or checking semiconductor wafers or devices (including integrated circuits) (No.): General Free; Special none; Column 2 40%.
  • 9030.84.00.00 Other, with a recording device (No.): General Free; Special none; Column 2 40%.
  • 9030.89.01.00 Other (under: Other instruments and apparatus) (No.): General Free; Special none; Column 2 40%.
  • 9030.90 Parts and accessories (under: Oscilloscopes, spectrum analyzers and other instruments and apparatus for measuring or checking electrical quantities, excluding meters of heading 9028; instruments and apparatus for measuring or detecting alpha, beta, gamma, X-ray, cosmic or other ionizing radiations; parts and accessories thereof:​).
  • 9030.90.25.00 Printed circuit assemblies (under: For articles of subheading 9030.10) (No.): General Free; Special none; Column 2 40%.
  • 9030.90.46.00 Other (under: For articles of subheading 9030.10) (kg, No.): General Free; Special none; Column 2 40%.
  • 9030.90.66.00 Of instruments and apparatus of subheading 9030.40 or 9030.82 (No.): General Free; Special none; Column 2 40%.
  • 9030.90.68.00 Other (under: Printed circuit assemblies) (No.): General Free; Special none; Column 2 40%.
  • 9030.90.84.00 Of instruments and apparatus of subheading 9030.82 (kg): General Free; Special none; Column 2 40%.
  • 9030.90.89 Other (under: Other): General Free; Special none; Column 2 40%.
  • 9030.90.89.11 Of articles of subheading 9030.20 (kg).
  • 9030.90.89.21 Of articles of subheading 9030.31 (kg).
  • 9030.90.89.22 Of articles of subheading 9030.32 (kg).
  • 9030.90.89.23 Of articles of subheading 9030.33 (kg).
  • 9030.90.89.31 Of articles of subheading 9030.39 (kg).
  • 9030.90.89.40 Of articles of subheading 9030.40 (kg).
  • 9030.90.89.56 Of articles of subheading 9030.84 (kg).
  • 9030.90.89.61 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.