HTS Heading 9032

Automatic regulating or controlling instruments and apparatus; parts and accessories thereof

All 24 HTS codes under heading 9032 (automatic regulating), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.7%.

Every line of heading 9032

  • 9032 Automatic regulating or controlling instruments and apparatus; parts and accessories thereof.
  • 9032.10.00 Thermostats (under: Automatic regulating or controlling instruments and apparatus; parts and accessories thereof): General 1.7%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9032.10.00.30 Designed for wall mounting (under: For air conditioning, refrigeration or heating systems) (No.).
  • 9032.10.00.60 Other (under: For air conditioning, refrigeration or heating systems) (No.).
  • 9032.10.00.90 Other (under: Thermostats) (No.).
  • 9032.20.00.00 Manostats (under: Automatic regulating or controlling instruments and apparatus; parts and accessories thereof) (No.): General Free; Special none; Column 2 35%.
  • 9032.81.00 Hydraulic and pneumatic (under: Other instruments and apparatus): General Free; Special none; Column 2 35%.
  • 9032.81.00.20 Hydraulic (under: Industrial process control instruments and apparatus) (No.).
  • 9032.81.00.60 Pneumatic (under: Industrial process control instruments and apparatus) (No.).
  • 9032.81.00.80 Other (under: Hydraulic and pneumatic) (No.).
  • 9032.89 Other (under: Other instruments and apparatus).
  • 9032.89.20.00 Designed for use in a 6, 12 or 24 V system (No.): General 1.1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 9032.89.40.00 Other (under: Automatic voltage and voltage-current regulators) (No.): General 1.7%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 9032.89.60 Other (under: Other): General 1.7%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9032.89.60.15 Complete systems (under: Control instruments for air conditioning, refrigeration or heating systems) (No.).
  • 9032.89.60.25 Other (under: Control instruments for air conditioning, refrigeration or heating systems) (No.).
  • 9032.89.60.30 Complete systems (under: Process control instruments and apparatus) (No.).
  • 9032.89.60.40 Temperature control instruments (No.).
  • 9032.89.60.50 Pressure and draft control instruments (No.).
  • 9032.89.60.60 Flow and liquid level control instruments (No.).
  • 9032.89.60.70 Humidity control instruments (under: Other) (No.).
  • 9032.89.60.75 Other (under: Other) (kg).
  • 9032.89.60.85 Other (under: Other) (kg).
  • 9032.90 Parts and accessories (under: Automatic regulating or controlling instruments and apparatus; parts and accessories thereof).
  • 9032.90.21.00 Designed for use in a 6, 12 or 24 V system (kg): General 1.1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 9032.90.41.00 Other (under: Of automatic voltage and voltage-current regulators) (kg): General 1.7%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 9032.90.61 Other (under: Parts and accessories): General 1.7%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9032.90.61.20 Of thermostats (under: Other) (kg).
  • 9032.90.61.40 Of manostats (under: Other) (kg).
  • 9032.90.61.60 Of instruments and apparatus of subheading 9032.81 (kg).
  • 9032.90.61.80 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.