HTS Heading 9033
Parts and accessories (not specified or included elsewhere in this chapter) for machines, appliances, instruments or apparatus of chapter 90
All 3 HTS codes under heading 9033 (parts and accessories), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.4%.
Every line of heading 9033
- 9033.00 Parts and accessories (not specified or included elsewhere in this chapter) for machines, appliances, instruments or apparatus of chapter 90.
- 9033.00.20.00 Light-emitting diode (LED) backlights modules, the foregoing which are lighting sources that consist of one or more LEDs and one or more connectors and are mounted on a printed circuit or other similar substrate, and other passive components, whether or not combined with optical components or protective diodes, and used as backlights illumination for liquid crystal displays (LCDs) (No.): General Free; Special none; Column 2 40%.
- 9033.00.30.00 Touch-sensitive data input devices (so-called “touch screens”) without display capabilities, for incorporation into apparatus having a display, which function by detecting the presence and location of a touch within the display area (such sensing may be obtained by means of resistance, electrostatic capacity, acoustic pulse recognition, infrared lights or other touch-sensitive technology) (No.): General Free; Special none; Column 2 40%.
- 9033.00.90.00 Other (under: Parts and accessories (not specified or included elsewhere in this chapter) for machines, appliances, instruments or apparatus of chapter 90) (kg): General 4.4%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.