HTS Heading 9109
Clock movements, complete and assembled
All 11 HTS codes under heading 9109 (clock movements), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.4%, some per unit.
Every line of heading 9109
- 9109 Clock movements, complete and assembled.
- 9109.10 Electrically operated (under: Clock movements, complete and assembled).
- 9109.10.10 With opto-electronic display only: General 3.9% on the movement + 5.3% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
- 9109.10.20 Measuring not over 50 mm in width or diameter: General 30¢ each + 5.3% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 75¢ each + 35% on the battery.
- 9109.10.30 Valued not over $5 each (under: Other): General 7.5¢ each + 3.2% on the movement + 2.6% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO, KR,MA, OM,P,PA,PE,S,SG); Column 2 $1.50 each + 65% on the movement + 35% on the battery.
- 9109.10.40 Valued over $5 each (under: Other): General 22¢ each + 3.2% on the movement + 2.6% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65% on the movement + 35% on the battery.
- 9109.10.50 With opto-electronic display only: General 3.9% on the movement + 5.3% on the battery; Special Free (A+,AU,BH, C,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 35%.
- 9109.10.60 Measuring not over 50 mm in width or diameter: General 20¢ each + 3.5% on the battery; Special Free (A+,AU,BH, C,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 75¢ each + 35% on the battery.
- 9109.10.70 Valued not over $5 each (under: Other): General 12¢ each + 5.1% on the movement + 4.2% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.50 each + 65% on the movement + 35% on the battery.
- 9109.10.80 Valued over $5 each (under: Other): General 30¢ each + 4.3% on the movement + 3.5% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S, SG); Column 2 $4.50 each + 65% on the movement + 35% on the battery.
- 9109.90 Other (under: Clock movements, complete and assembled).
- 9109.90.20.00 Measuring not over 50 mm in width or diameter (No.): General 20¢ each; Special Free (A+,AU,B,BH, C,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 75¢ each.
- 9109.90.40.00 Valued not over $5 each (under: Other) (No.): General 15¢ each + 6.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.50 each + 65%.
- 9109.90.60.00 Valued over $5 each (under: Other) (No.): General 30¢ each + 4.3%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.