HTS Heading 9108
Watch movements, complete and assembled
All 18 HTS codes under heading 9108 (watch movements), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 9108
- 9108 Watch movements, complete and assembled.
- 9108.11 With mechanical display only or with a device to which a mechanical display can be incorporated.
- 9108.11.40 Having no jewels or only one jewel: General 36¢ each + 5.3% on the battery; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $1.50 each + 35% on the battery.
- 9108.11.80 Other (under: With mechanical display only or with a device to which a mechanical display can be incorporated): General 72¢ each + 5.3% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $2.50 each + 35% on the battery.
- 9108.12.00 With opto-electronic display only: General 3.1% on the movement + 4.2% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 35%.
- 9108.19 Other (under: Electrically operated).
- 9108.19.40 Having no jewels or only one jewel: General 28¢ each + 4.2% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $1.50 each + 35% on the battery.
- 9108.19.80 Other (under: Other): General 53¢ each + 3.9% on the battery; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $2.50 each + 35% on the battery.
- 9108.20 With automatic winding (under: Watch movements, complete and assembled).
- 9108.20.40.00 Having over 17 jewels (under: With automatic winding) (No.): General Free; Special none; Column 2 $10.75 each.
- 9108.20.80.00 Other (under: With automatic winding) (No.): General Free; Special none; Column 2 $5.00 each.
- 9108.90 Other (under: Watch movements, complete and assembled).
- 9108.90.10.00 Measuring 33.8 mm or less (under: Having no jewels or only one jewel) (No.): General 29¢ each; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.50 each.
- 9108.90.20.00 Other (under: Having no jewels or only one jewel) (No.): General 25¢ each; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.50 each.
- 9108.90.30.00 Measuring 33.8 mm or less (under: Having over one jewel but not over 7 jewels) (No.): General 57¢ each; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $2.50 each.
- 9108.90.40.00 Other (under: Having over one jewel but not over 7 jewels) (No.): General 25¢ each; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $1.50 each.
- 9108.90.50.00 Measuring not over 15.2 mm (under: Valued not over $15 each) (No.): General $2.16 each; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4 each.
- 9108.90.60.00 Measuring over 15.2 mm (under: Valued not over $15 each) (No.): General $1.80 each; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4 each.
- 9108.90.70.00 Valued over $15 each (under: Measuring 33.8 mm or less) (No.): General 90¢ each; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $4 each.
- 9108.90.80.00 Valued not over $15 each (under: Other) (No.): General $1.44 each; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 $4 each.
- 9108.90.85.00 Valued over $15 each (under: Other) (No.): General Free; Special none; Column 2 $4 each.
- 9108.90.90.00 Measuring 33.8 mm or less (under: Having over 17 jewels) (No.): General $1.50 each; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $10.75 each.
- 9108.90.95.00 Other (under: Having over 17 jewels) (No.): General $1.72 each; Special Free (AU,BH, CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $10.75 each.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.