HTS Heading 9111

Watch cases and parts thereof

All 7 HTS codes under heading 9111 (watch cases), with their duty rates from the 2026 HTS Revision 23. General duty 4.8% to 7.6%, some per unit.

Every line of heading 9111

  • 9111 Watch cases and parts thereof.
  • 9111.10.00.00 Cases of precious metal or of metal clad with precious metal (No.): General 12¢ each + 4.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 75¢ each + 45%.
  • 9111.20 Cases of base metal, whether or not gold- or silver-plated.
  • 9111.20.20.00 Gold- or silver-plated (under: Cases of base metal, whether or not gold- or silver-plated) (No.): General 7¢ each + 5.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 40¢ each + 45%.
  • 9111.20.40.00 Other (under: Cases of base metal, whether or not gold- or silver-plated) (No.): General 3.6¢ each + 7.6%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 20¢ each + 45%.
  • 9111.80.00.00 Other cases (under: Watch cases and parts thereof) (No.): General 3.6¢ each + 7.6%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 20¢ each + 45%.
  • 9111.90 Parts (under: Watch cases and parts thereof).
  • 9111.90.40.00 Of precious metal or of metal clad with precious metal (No.): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 75¢ each + 45%.
  • 9111.90.50.00 Bezels, backs and centers (under: Other) (No.): General 1.6¢ each + 6.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 10¢ each + 45%.
  • 9111.90.70.00 Other (under: Other) (No.): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.