HTS Heading 9112

Clock cases and cases of a similar type for other goods of this chapter, and parts thereof

All 3 HTS codes under heading 9112 (clock cases and cases of a similar type), with their duty rates from the 2026 HTS Revision 23. General duty 3.5% to 5.5%.

Every line of heading 9112

  • 9112 Clock cases and cases of a similar type for other goods of this chapter, and parts thereof.
  • 9112.20 Cases (under: Clock cases and cases of a similar type for other goods of this chapter, and parts thereof).
  • 9112.20.40.00 Cases of metal (under: Cases) (No.): General 3.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 45%.
  • 9112.20.80.00 Other cases (under: Cases) (No.): General 5.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9112.90.00.00 Parts (under: Clock cases and cases of a similar type for other goods of this chapter, and parts thereof) (kg): General 5.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.