HTS Heading 9207
Musical instruments, the sound of which is produced, or must be amplified, electrically (for example, organs, guitars, accordions)
All 9 HTS codes under heading 9207 (musical instruments), with their duty rates from the 2026 HTS Revision 23. General duty 5% to 5.4%.
Every line of heading 9207
- 9207 Musical instruments, the sound of which is produced, or must be amplified, electrically (for example, organs, guitars, accordions).
- 9207.10.00 Keyboard instruments, other than accordions: General 5.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 2.7% (JP); Column 2 40%.
- 9207.10.00.05 Valued under $100 each (under: Music synthesizers) (No.).
- 9207.10.00.10 Valued $100 or over each (under: Music synthesizers) (No.).
- 9207.10.00.45 Valued under $200 each (under: With more than one keyboard) (No.).
- 9207.10.00.55 Valued $200 or over each (under: With more than one keyboard) (No.).
- 9207.10.00.60 Hand-held (under: With one keyboard) (No.).
- 9207.10.00.65 Valued under $100 each (under: Other) (No.).
- 9207.10.00.75 Valued $100 or over each (under: Other) (No.).
- 9207.90.00 Other (under: Musical instruments, the sound of which is produced, or must be amplified, electrically (for example, organs, guitars, accordions)): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9207.90.00.40 Fretted stringed instruments (under: Other) (No.).
- 9207.90.00.80 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.