HTS Heading 9206
Percussion musical instruments (for example, drums, xylophones, cymbals, castanets, maracas)
All 4 HTS codes under heading 9206 (percussion musical instruments), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.3%.
Every line of heading 9206
- 9206.00 Percussion musical instruments (for example, drums, xylophones, cymbals, castanets, maracas).
- 9206.00.20.00 Drums (under: Percussion musical instruments (for example, drums, xylophones, cymbals, castanets, maracas)) (No.): General 4.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9206.00.40.00 Cymbals (under: Percussion musical instruments (for example, drums, xylophones, cymbals, castanets, maracas)) (No.): General Free; Special none; Column 2 40%.
- 9206.00.60.00 Sets of tuned bells known as chimes, peals or carillons (No.): General Free; Special none; Column 2 50%.
- 9206.00.80.00 Other (under: Percussion musical instruments (for example, drums, xylophones, cymbals, castanets, maracas)) (No.): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.