HTS Heading 9209
Parts (for example, mechanisms for music boxes) and accessories (for example, cards, discs and rolls for mechanical instruments) of musical instruments; metronomes, tuning forks and pitch pipes of all kinds
All 18 HTS codes under heading 9209 (parts), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.7%.
Every line of heading 9209
- 9209 Parts (for example, mechanisms for music boxes) and accessories (for example, cards, discs and rolls for mechanical instruments) of musical instruments; metronomes, tuning forks and pitch pipes of all kinds.
- 9209.30.00.00 Musical instrument strings (under: Parts (for example, mechanisms for music boxes) and accessories (for example, cards, discs and rolls for mechanical instruments) of musical instruments; metronomes, tuning forks and pitch pipes of all kinds) (No.): General Free; Special none; Column 2 40%.
- 9209.91 Parts and accessories for pianos.
- 9209.91.40.00 Tuning pins (under: Parts and accessories for pianos) (thousands): General Free; Special none; Column 2 $1/1,000 pins + 35%.
- 9209.91.80.00 Other (under: Parts and accessories for pianos) (No.): General 4.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 40%.
- 9209.92 Parts and accessories for the musical instruments of heading 9202.
- 9209.92.20.00 Mutes, collapsible musical instrument stands and music holders for attachment to musical instruments (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9209.92.40.00 Tuning pins (under: Parts and accessories for the musical instruments of heading 9202) (thousands): General 10¢/1,000 pins + 3.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1/1,000 pins + 35%.
- 9209.92.60.00 Bows, parts of bows, bow hair, chin rests and other parts and accessories for string instruments played with a bow (No.): General Free; Special none; Column 2 40%.
- 9209.92.80.00 Other (under: Parts and accessories for the musical instruments of heading 9202) (No.): General 4.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9209.94 Parts and accessories for the musical instruments of heading 9207.
- 9209.94.40.00 Collapsible musical instrument stands (No.): General 5.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9209.94.80.00 Other (under: Parts and accessories for the musical instruments of heading 9207) (No.): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9209.99 Other (under: Other).
- 9209.99.05.00 Metronomes, tuning forks and pitch pipes (No., kg): General Free; Special none; Column 2 40%.
- 9209.99.10.00 Mutes for musical instruments; pedals, dampers and spurs for drums; pedals and holders for cymbals; lyres and other music holders for attachment to musical instruments; and collapsible stands for holding music or for holding musical instruments (No.): General 5.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9209.99.16.00 For pipe organs of subheading 9205.90.12 (No., kg): General Free; Special none; Column 2 35%.
- 9209.99.18.00 For instruments of subheading 9205.90.14 (No.): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9209.99.20.00 For bagpipes (under: Other) (No., kg): General Free; Special none; Column 2 40%.
- 9209.99.40 For other woodwind and brass wind musical instruments: General Free; Special none; Column 2 40%.
- 9209.99.40.40 For woodwind musical instruments (No., kg).
- 9209.99.40.80 Other (under: For other woodwind and brass wind musical instruments) (No., kg).
- 9209.99.61.00 For music boxes (under: Other) (No., kg): General Free; Special none; Column 2 40%.
- 9209.99.80.00 Other (under: Other) (No.): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.