HTS Heading 9301
Military weapons, other than revolvers, pistols and the arms of heading 9307
All 8 HTS codes under heading 9301 (military weapons, other than revolvers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.6%.
Every line of heading 9301
- 9301 Military weapons, other than revolvers, pistols and the arms of heading 9307.
- 9301.10.00 Artillery weapons (for example, guns, howitzers and mortars): General Free; Special none; Column 2 27.5%.
- 9301.10.00.10 Self propelled (under: Artillery weapons (for example, guns, howitzers and mortars)) (No.).
- 9301.10.00.80 Other (under: Artillery weapons (for example, guns, howitzers and mortars)) (No.).
- 9301.20.00.00 Rocket launchers; flame-throwers; grenade launchers; torpedo tubes and similar projectors (No): General Free; Special none; Column 2 27.5%.
- 9301.90 Other (under: Military weapons, other than revolvers, pistols and the arms of heading 9307).
- 9301.90.30 Rifles (under: Other): General 4.7% on the value of the rifle + 20% on the value of the telescopic sight, if any; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 9301.90.30.10 Telescopic sights imported with rifles (No.).
- 9301.90.30.20 Rifles (under: Rifles) (No.).
- 9301.90.60.00 Shotguns (under: Other) (No.): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 9301.90.90 Other (under: Other): General Free; Special none; Column 2 27.5%.
- 9301.90.90.30 Machine guns (under: Other) (No.).
- 9301.90.90.90 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.