HTS Heading 9306
Bombs, grenades, torpedoes, mines, missiles and similar munitions of war and parts thereof; cartridges and other ammunition and projectiles and parts thereof, including shot and cartridgewads
All 15 HTS codes under heading 9306 (bombs, grenades, torpedoes, mines), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 9306
- 9306 Bombs, grenades, torpedoes, mines, missiles and similar munitions of war and parts thereof; cartridges and other ammunition and projectiles and parts thereof, including shot and cartridgewads.
- 9306.21.00.00 Cartridges (under: Shotgun cartridges and parts thereof; air gun pellets) (No.): General Free; Special none; Column 2 30%.
- 9306.29.00.00 Other (under: Shotgun cartridges and parts thereof; air gun pellets) (kg): General Free; Special none; Column 2 45%.
- 9306.30 Other cartridges and parts thereof.
- 9306.30.41 Cartridges and empty cartridge shells: General Free; Special none; Column 2 30%.
- 9306.30.41.10 .22 caliber (under: For rifles or pistols) (No.).
- 9306.30.41.20 Other (under: For rifles or pistols) (No.).
- 9306.30.41.30 Other (under: Cartridges containing a projectile) (No.).
- 9306.30.41.38 Cartridges for riveting or similar tools or for captive-bolt humane killers and parts thereof (thousands).
- 9306.30.41.40 For rifles or pistols (under: Empty cartridge shells) (No.).
- 9306.30.41.50 Other (under: Empty cartridge shells) (No.).
- 9306.30.41.60 Other (under: Cartridges and empty cartridge shells) (No.).
- 9306.30.80.00 Other (under: Other cartridges and parts thereof) (kg): General Free; Special none; Column 2 45%.
- 9306.90.00 Other (under: Bombs, grenades, torpedoes, mines, missiles and similar munitions of war and parts thereof; cartridges and other ammunition and projectiles and parts thereof, including shot and cartridgewads): General Free; Special none; Column 2 45%.
- 9306.90.00.20 Guided missiles (under: Other) (No.).
- 9306.90.00.41 Paintballs (under: Bombs, grenades, torpedoes, mines and similar munitions of war; other ammunition and projectiles) (No.).
- 9306.90.00.50 Other (under: Bombs, grenades, torpedoes, mines and similar munitions of war; other ammunition and projectiles) (kg).
- 9306.90.00.60 Parts for guided missiles (under: Other) (kg).
- 9306.90.00.80 Parts for bombs, grenades, torpedoes, mines and similar munitions of war; parts of other ammunition and projectiles (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.