HTS Heading 9305
Parts and accessories of articles of headings 9301 to 9304
All 20 HTS codes under heading 9305 (parts and accessories of articles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.2%.
Every line of heading 9305
- 9305 Parts and accessories of articles of headings 9301 to 9304.
- 9305.10 Of revolvers or pistols (under: Parts and accessories of articles of headings 9301 to 9304).
- 9305.10.20 Of heading 9302 (under: Of revolvers or pistols): General 4.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 105%.
- 9305.10.20.10 Frames and receivers (under: Of heading 9302) (No.).
- 9305.10.20.80 Other (under: Of heading 9302) (kg).
- 9305.10.40.00 Of revolvers or pistols designed to fire only blank cartridges or blank ammunition (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 105%.
- 9305.10.60.00 Of muzzle-loading revolvers and pistols (kg): General Free; Special none; Column 2 Free.
- 9305.10.80.00 Other (under: Other) (kg): General Free; Special none; Column 2 27.5%.
- 9305.20 Of shotguns or rifles of heading 9303.
- 9305.20.05.00 Rifle stocks (under: Of shotguns or rifles of heading 9303) (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 69.5%.
- 9305.20.80 Other (under: Of shotguns or rifles of heading 9303): General Free; Special none; Column 2 73.5%.
- 9305.20.80.04 Of muzzle-loading shotguns (under: Shotgun barrels) (No.).
- 9305.20.80.08 Other (under: Shotgun barrels) (No.).
- 9305.20.80.20 Other parts of muzzle-loading shotguns or rifles (kg).
- 9305.20.80.31 Stocks (under: Of shotguns, including shotgun-rifle combinations) (No.).
- 9305.20.80.33 Other (under: Of shotguns, including shotgun-rifle combinations) (kg).
- 9305.20.80.60 Of rifles (under: Other) (kg).
- 9305.91 Of military weapons of heading 9301.
- 9305.91.10.00 Of rifles (under: Of military weapons of heading 9301) (kg): General Free; Special none; Column 2 55%.
- 9305.91.20.00 Of shotguns (under: Of military weapons of heading 9301) (kg): General Free; Special none; Column 2 55%.
- 9305.91.30 Other (under: Of military weapons of heading 9301): General Free; Special none; Column 2 27.5%.
- 9305.91.30.10 Of artillery weapons of 9301.10 (kg).
- 9305.91.30.30 Other (under: Other) (kg).
- 9305.99 Other (under: Other).
- 9305.99.40.00 Of articles of heading 9303 other than shotguns or rifles (kg): General Free; Special none; Column 2 27.5%.
- 9305.99.50 Of articles of subheading 9304.00.20 or 9304.00.40: General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 70%.
- 9305.99.50.10 Parts and accessories of paintball markers (kg).
- 9305.99.50.50 Other (under: Of articles of subheading 9304.00.20 or 9304.00.40) (kg).
- 9305.99.60.00 Other (under: Other) (kg): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.