HTS Heading 9503
Tricycles, scooters, pedal cars and similar wheeled toys; dollsʼ carriages; dolls, other toys; reduced-scale (“scaleˮ) models and similar recreational models, working or not; puzzles of all kinds; parts and accessories thereof
All 5 HTS codes under heading 9503 (tricycles, scooters), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 9503
- 9503.00.00 Tricycles, scooters, pedal cars and similar wheeled toys; dollsʼ carriages; dolls, other toys; reduced-scale (“scaleˮ) models and similar recreational models, working or not; puzzles of all kinds; parts and accessories thereof: General Free; Special none; Column 2 70%.
- 9503.00.00.11 Under 3 years of age (under: Labeled or determined by importer as intended for use by persons) (No.).
- 9503.00.00.13 3 to 12 years of age (under: Labeled or determined by importer as intended for use by persons) (No.).
- 9503.00.00.71 Under 3 years of age (under: Labeled or determined by importer as intended for use by persons) (No.).
- 9503.00.00.73 3 to 12 years of age (under: Labeled or determined by importer as intended for use by persons) (No.).
- 9503.00.00.90 Other (under: Tricycles, scooters, pedal cars and similar wheeled toys; dollsʼ carriages; dolls, other toys; reduced-scale (“scaleˮ) models and similar recreational models, working or not; puzzles of all kinds; parts and accessories thereof) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.