HTS Heading 9504

Video game consoles and machines, table or parlor games, including pinball machines, billiards, special tables for casino games and automatic bowling equipment, amusement machines operated by coins, banknotes, bank cards, tokens or by any other means of payment

All 15 HTS codes under heading 9504 (video game consoles and machines), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 9504

  • 9504 Video game consoles and machines, table or parlor games, including pinball machines, billiards, special tables for casino games and automatic bowling equipment, amusement machines operated by coins, banknotes, bank cards, tokens or by any other means of payment.
  • 9504.20 Articles and accessories for billiards of all kinds.
  • 9504.20.20.00 Balls (under: Articles and accessories for billiards of all kinds) (No.): General Free; Special none; Column 2 50%.
  • 9504.20.40.00 Chalk (under: Articles and accessories for billiards of all kinds) (No.): General Free; Special none; Column 2 25%.
  • 9504.20.60.00 Tables (under: Articles and accessories for billiards of all kinds) (No.): General Free; Special none; Column 2 33 1/3%.
  • 9504.20.80.00 Other, including parts and accessories (kg): General Free; Special none; Column 2 33 1/3%.
  • 9504.30.00 Other games, operated by coins, banknotes, bank cards, tokens or by any other means of payment, other than automatic bowling alley equipment; parts and accessories thereof: General Free; Special none; Column 2 35%.
  • 9504.30.00.10 Video (under: Other games, operated by coins, banknotes, bank cards, tokens or by any other means of payment, other than automatic bowling alley equipment; parts and accessories thereof) (No.).
  • 9504.30.00.20 Pinball machines and bell-type machines and consoles (No.).
  • 9504.30.00.40 Other (under: Games) (No.).
  • 9504.30.00.60 Parts and accessories (under: Other) (No.).
  • 9504.40.00.00 Playing cards (under: Video game consoles and machines, table or parlor games, including pinball machines, billiards, special tables for casino games and automatic bowling equipment, amusement machines operated by coins, banknotes, bank cards, tokens or by any other means of payment) (pack): General Free; Special none; Column 2 10¢/pack + 20%.
  • 9504.50.00.00 Video game consoles and machines, other than those of subheading 9504.30, and parts and accessories thereof (No.): General Free; Special none; Column 2 35%.
  • 9504.90 Other (under: Video game consoles and machines, table or parlor games, including pinball machines, billiards, special tables for casino games and automatic bowling equipment, amusement machines operated by coins, banknotes, bank cards, tokens or by any other means of payment).
  • 9504.90.40.00 Game machines, other than those operated by coins, banknotes (paper currency), discs or similar articles; parts and accessories thereof (No.): General Free; Special none; Column 2 35%.
  • 9504.90.60.00 Chess, checkers, parchisi, backgammon, darts and other games played on boards of a special design, all the foregoing games and parts there of (including their boards); mah-jong and dominoes; any of the foregoing games in combination with each other, or with other games, packaged together as a unit in immediate containers of a type used in retail sales; poker chips and dice (No.): General Free; Special none; Column 2 40%.
  • 9504.90.90 Other (under: Other): General Free; Special none; Column 2 40%.
  • 9504.90.90.40 Bowling balls (under: Other) (No.).
  • 9504.90.90.60 Bowling equipment and parts and accessories thereof (No.).
  • 9504.90.90.80 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.