HTS Chapter 79
Zinc and articles thereof
The 6 headings and 13 HTS codes of chapter 79 (zinc and articles thereof), with their duty rates from the 2026 HTS Revision 23.
The 6 headings of chapter 79
- 7901: Unwrought zinc (4 codes, General duty 1.5% to 3%)
- 7902: Zinc waste and scrap (1 code, General duty Free)
- 7903: Zinc dust, powders and flakes (3 codes, General duty Free to 3%, some per unit)
- 7904: Zinc bars, rods, profiles and wire (1 code, General duty 4.2%)
- 7905: Zinc plates, sheets, strip and foil (1 code, General duty 2.8%)
- 7907: Other articles of zinc (3 codes, General duty 3%)
Where it sits in the schedule
Chapter 79 is in Section XV of the Harmonized System, base metals and their articles (chapters 72 to 83). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.