HTS Heading 7901
Unwrought zinc
All 4 HTS codes under heading 7901 (unwrought zinc), with their duty rates from the 2026 HTS Revision 23. General duty 1.5% to 3%.
Every line of heading 7901
- 7901 Unwrought zinc.
- 7901.11.00.00 Containing by weight 99.99 percent or more of zinc (kg): General 1.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5%.
- 7901.12 Containing by weight less than 99.99 percent of zinc.
- 7901.12.10.00 Casting-grade zinc (under: Containing by weight less than 99.99 percent of zinc) (kg): General 3%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 45%.
- 7901.12.50.00 Other (under: Containing by weight less than 99.99 percent of zinc) (kg): General 1.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5%.
- 7901.20.00.00 Zinc alloys (under: Unwrought zinc) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.