Market Wire

Capacity utilization, total industry Stands at 76.85, Highest Since December 2023

Capacity utilization, total industry stands at 76.85 in September 2026 — the highest print since December 2023, 33 months back.

  • September 2026: 76.85
  • archive high (January 1967): 89.39
  • percentile of archive range: 50th

The archive has run from 64.08 (April 2020) to 89.39 (January 1967); this print sits at the 50th percentile of that band. The last time the series printed higher was December 2023. The standing trend is rising.

The comparison is measured inside the archive, which starts January 1967; older history is not held and not claimed. Source: Federal Reserve G.17 via FRED.

Published 2026-10-16.