Market Wire
Empire State Manufacturing Survey Falls to 7.8 From 25.5 in November 2026
Empire State Manufacturing Survey came in at 7.8 in November 2026, 17.7 points below the prior reading of 25.5. On a diffusion index the sign is the signal: above zero means more respondents reporting expansion than contraction, and the distance from zero is how lopsided the split is.
- November 2026: 7.8
- prior (October 2026): 25.5
- change: -17.7 pts
Empire State Manufacturing Survey has ranged from -7.0 (September 2025) to 25.5 (October 2026) over the archived window, which puts the current reading 46% of the way up that range.
Survey readings are noisy month to month, so the standing trend matters more than any single print: this series has been rising across recent readings. Source: Federal Reserve district surveys via FRED.
Published 2026-11-27.