Market Wire
Manufacturing in Hawaii Runs 97% Above the National Cost Average
Hawaii's manufacturing cost index stands at 197.0 against a national 100 as of August 2026 — labor at 126.7 and industrial energy at 408.0. That places it 51st cheapest of 51 jurisdictions.
- composite (US = 100): 197.0
- labor: 126.7
- industrial energy: 408.0
The composite weights labor at 75% and industrial electricity at 25%, so Hawaii's position is mostly an energy story: its energy component indexes at 408.0 against the national 100. A premium of 97 points compounds differently across shops — a labor-heavy job shop feels the labor line, an energy-hungry process plant feels the kilowatt-hours.
For a site decision the index is the starting point, not the answer: freight to customers, workforce depth, and incentives move individual cases. The per-state page carries the underlying wage and electricity series this index is built from, both refreshed automatically.
Published 2026-10-29.