Market Wire
Manufacturing in Alaska Runs 60% Above the National Cost Average
Alaska's manufacturing cost index stands at 159.8 against a national 100 as of July 2026 — labor at 128.4 and industrial energy at 253.9. That places it 49th cheapest of 51 jurisdictions.
- composite (US = 100): 159.8
- labor: 128.4
- industrial energy: 253.9
The composite weights labor at 75% and industrial electricity at 25%, so Alaska's position is mostly an energy story: its energy component indexes at 253.9 against the national 100. A premium of 60 points compounds differently across shops — a labor-heavy job shop feels the labor line, an energy-hungry process plant feels the kilowatt-hours.
For a site decision the index is the starting point, not the answer: freight to customers, workforce depth, and incentives move individual cases. The per-state page carries the underlying wage and electricity series this index is built from, both refreshed automatically.
Published 2026-10-23.