Market Wire
Industrial Power Surges to 9.77¢/kWh
Correction (2026-11-17): This article put the change in the annual power bill at $702, worked out from the rounded year-over-year percent. From the two prices, 9.77¢ per kWh against 9.33¢ a year earlier, 160,000 kWh costs $704 more. The original publication date, observation periods and URL are preserved.
Industrial Power surges 6.5% in July 2026 to 9.77¢/kWh and up 4.7% from a year earlier. A 40 kW machining center on two shifts burns 160,000 kWh a year — $15,632 at this price, $704 more than a year ago.
- July 2026: 9.77¢/kWh
- on the month: +6.5%
- on the year: +4.7%
The print sits 100% of the way up the archived range of 8.21¢/kWh (April 2025) to 9.77¢/kWh (July 2026), with the standing trend rising.
The year-over-year comparison is against July 2025, which printed 9.33¢/kWh. Source: EIA Electricity Data Browser, retail sales, industrial sector. The number above is the agency's published value, unrounded; the history and any later revisions stay queryable on the live data page.
Published 2026-10-02.