Market Wire

Industrial Power Jumps to 9.17¢/kWh

Correction (2026-11-17): This article put the change in the annual power bill at $427, worked out from the rounded year-over-year percent. From the two prices, 9.17¢ per kWh against 8.90¢ a year earlier, 160,000 kWh costs $432 more. The original publication date, observation periods and URL are preserved.

Industrial Power jumps 5.3% in June 2026 to 9.17¢/kWh and up 3.0% from a year earlier. A 40 kW machining center on two shifts burns 160,000 kWh a year — $14,672 at this price, $432 more than a year ago.

  • June 2026: 9.17¢/kWh
  • on the month: +5.3%
  • on the year: +3.0%

The print sits 86% of the way up the archived range of 8.21¢/kWh (April 2025) to 9.33¢/kWh (July 2025), with the standing trend falling.

The year-over-year comparison is against June 2025, which printed 8.90¢/kWh. Source: EIA Electricity Data Browser, retail sales, industrial sector. The number above is the agency's published value, unrounded; the history and any later revisions stay queryable on the live data page.

Published 2026-08-27.