Market Wire

Manufacturing in Maine Runs 20% Above the National Cost Average

Maine's manufacturing cost index stands at 120.2 against a national 100 as of August 2026 — labor at 111.0 and industrial energy at 147.7. That places it 42nd cheapest of 51 jurisdictions.

  • composite (US = 100): 120.2
  • labor: 111.0
  • industrial energy: 147.7

The composite weights labor at 75% and industrial electricity at 25%, so Maine's position is mostly an energy story: its energy component indexes at 147.7 against the national 100. A premium of 20 points compounds differently across shops — a labor-heavy job shop feels the labor line, an energy-hungry process plant feels the kilowatt-hours.

For a site decision the index is the starting point, not the answer: freight to customers, workforce depth, and incentives move individual cases. The per-state page carries the underlying wage and electricity series this index is built from, both refreshed automatically.

Published 2026-11-12.