MRF KPIs

Waste Sorting KPIs and Benchmarks: Recovery, Purity, Uptime and Labor for MRFs

Recovery, bale purity, availability, tons per labor hour, energy and residue: how to measure each sorting plant KPI, what moves it, and which figures have a cited source.

† marks a figure with no cited source: it is kept as originally published and is illustrative. How the figures are sourced

Six KPIs describe a sorting plant: recovery rate, bale purity, availability, throughput per labor hour, energy per ton, and residue rate. Everything else drives one of those six. Use the ranges below as reference points for spotting a gap, not as targets, and compare yourself with plants that receive similar inbound material.

Every figure shows its basis. A superscript number links to a public source in the Sources list, and the sentence gives that source's scope. A figure marked no cited source is kept exactly as originally published because no public source stating it was found, so treat it as illustrative.

At a glance

Material recovery facility KPI benchmarks at a glance
KPITypicalStrongBasis
Recovery rate of targeted recyclables80 to 85%92 to 95% (world class)†
Recoverables left in residueNot statedBelow 10% (best plants)†
PET bale purity92 to 94%96 to 98% (world class)†
Aluminum UBC bale purityNot statedShould exceed 98%†
Mixed paper outthrows5 to 8% (weak plants)Under 3% (strong plants; the grade limit)Plant figures†; 3% grade limit, ReMA ISRI grade (54)1
Availability, scheduled hours at rate80 to 85%92 to 95% (the best)†
Unplanned downtime, share of scheduled timeNot statedUnder 3% (world class)†
Screen wrapper cleanout per shift30 to 60 minUnder 15 min (best in class)†
Tons per labor hour, legacy manual plants0.5 to 0.8Not stated†
Tons per labor hour, automated plants1.0 to 1.5 (modernized lines with optics)> 2.0 (highly automated)†
Human sorter picks per minute30 to 4045 to 50 (top performers)†
Robot picks per minuteNot statedUp to 65 (one model's rated maximum)AMP datasheet2
Recordable injury cases per 100 workers5.9 (U.S. MRF average, 2024)Not statedBLS3
Energy intensity8 to 15 kWh/tonUnder 8 kWh/ton (world class)†
Residue, share of outbound material13.7% (seven U.S. MRFs, 2019)Not statedRecycling Partnership4
Screen separation efficiency80 to 85%> 90% (well maintained, correctly loaded)†
Words in parentheses give each figure's original framing or the source's scope. Not stated means the original guide gave no figure for that column. The ranges are framed for single stream MRFs in the 15 to 35 ton per hour class†.

Method: How the figures in this guide are sourced

A figure with a superscript number is stated by the cited source, listed under Sources with its publisher, location in the document and access date, and the sentence gives its scope. A figure marked no cited source is kept exactly as originally published because no public source stating it was found. It is illustrative, not measured industry data. Trading-grade limits are what a bale must meet to sell, not measured plant results, and worked examples show arithmetic only.

Recovery rate

Recovery rate is the share of targeted recyclables that end up in a saleable product. It runs 80 to 85 percent at a typical plant and 92 to 95 percent at world class facilities using optical sorters with recirculation loops and robotic quality control (QC)†.

Measure it from the other side, by weighing what the plant throws away. Residue containing 25 percent recoverable PET, aluminum, and fiber means real money on the floor; the best plants keep recoverables in residue below 10 percent†.

The biggest single lever is burden depth control, since an overloaded optical belt can drop recovery by 10 to 15 points during peak hours†.

How to measure

  • Divide targeted recyclables shipped as saleable product by targeted recyclables received.
  • Pull a 90 kg residue sample every week and weigh the recoverable PET, aluminum, and fiber in it.
  • Trend the weekly audit results every month.

What moves it

  • Burden depth control on optical sorter belts, especially at peak hours.
  • Recirculation loops that give missed material a second pass.
  • Robotic QC after the optics.

See how ejection accuracy and availability drive sorted tons with the Optical Sorter Throughput calculator.

Bale purity

Purity is what buyers pay for. Typical PET bales run 92 to 94 percent, world class 96 to 98†. Aluminum used beverage can (UBC) bales should exceed 98 percent†.

Mixed paper holds under 3 percent outthrows at strong plants versus 5 to 8 at weak ones†. For comparison, ReMA's ISRI grade (54) Mixed Paper specification allows outthrows of no more than 3 percent and prohibitive materials of no more than 2 percent1, so a bale at the weak-plant level falls outside that grade.

For PET, ReMA's ISRI specification grades bales by the share of PET bottles they contain. These are trading thresholds a bale must meet, not measured plant results.

ReMA ISRI PET bale grades for PET bottles, no thermoforms (July 2026)
GradeTotal PET bottle fraction by weightBasis
Grade A94% or aboveReMA ISRI5
Grade B83 to 93%ReMA ISRI5
Grade C73 to 82%ReMA ISRI5
Each contaminant the specification tolerates at low levels should not exceed 2 percent by weight5. Buyers may agree different terms.

How to measure

  • Run a bale breakdown audit for each commodity every week.
  • Weigh outthrows and prohibitive materials against the sampled bale weight.
  • Log every audit so you get a trend line instead of anecdotes.

What moves it

  • Last chance manual QC positioned after the optics, the biggest purity lever.
  • A dual pass optical configuration on containers.
  • Film removal early in the process, since film that reaches the container line degrades every downstream sort.

Compare each audit with the specification or broker target in the Contamination Rate calculator.

Availability

Availability means scheduled hours actually running at rate. It sits at 80 to 85 percent for typical plants and 92 to 95 percent for the best†. World class plants hold unplanned downtime under 3 percent of scheduled time†.

Two specific losses matter here. The first is wrapper and tangler cleanout on screens: typical plants lose 30 to 60 minutes per shift, and best in class plants lose under 15 with non wrapping screen designs†.

The second is optical sensor fouling. Ejection accuracy commonly drops 5 to 10 percent when cleaning intervals stretch past 8 running hours in dusty fiber applications†, so set the interval on purpose rather than by habit.

How to measure

  • Divide hours running at rate by scheduled hours.
  • Split downtime into planned and unplanned categories.
  • Log screen cleanout minutes per shift as their own line.

What moves it

  • Non wrapping screen designs that shorten cleanout.
  • A set optical sensor cleaning interval on dusty fiber lines.
  • A daily downtime huddle on the previous day's stops.

The Optical Sorter Throughput calculator and the Baler Capacity calculator both take availability as an input, so you can see what each point is worth in tons.

Throughput per labor hour

Throughput per labor hour separates plant generations. Legacy manual plants process 0.5 to 0.8 tons per labor hour, modernized lines with optics run 1.0 to 1.5, and highly automated facilities exceed 2.0†.

On the pick line itself, a typical human sorter sustains 30 to 40 picks per minute, and top performers reach 45 to 50†. For robots, one manufacturer rates its belt-mounted Delta Compact at up to 65 picks per minute2, a single model's rated maximum rather than a fleet average. Robots sort with better than 90 percent accuracy on well presented material†.

Track safety beside productivity. In 2024, U.S. materials recovery facilities reported 5.9 recordable injury and illness cases per 100 full-time workers and a days away, restricted or transferred (DART) rate of 4.8, against 2.7 and 1.7 for all manufacturing3.

How to measure

  • Divide tons processed by paid labor hours for the same period.
  • Convert station counts and pick rates into tons per labor hour.
  • Benchmark the result every quarter.

What moves it

  • Stabilizing burden depth first, so every station sees well presented material.
  • Automating the highest volume commodity second.
  • Redeploying people to QC rather than cutting heads immediately.

Before choosing which commodity to automate, size what one optical unit sorts per shift with the Optical Sorter Throughput calculator.

Energy per ton

Energy intensity runs 8 to 15 kWh per ton at typical plants†. Under 8 is world class, and under 6 has been demonstrated with full variable frequency drive (VFD) conveyance and demand controlled air†.

Air handling and conveyance together usually account for 60 to 70 percent of plant draw†, so that is where to look first.

How to measure

  • Divide metered kWh by tons processed over the same period.
  • Submeter conveyors and air systems separately where you can.
  • Trend the figure monthly with the rest of the scorecard.

What moves it

  • Variable frequency drives across conveyance.
  • Demand controlled air on separators.

Break the load into addressable pieces with the Sort Line Conveyor Energy calculator and the Air Separator Energy calculator.

Residue rate

Residue is what leaves the plant as waste instead of product. In a November 2019 survey of seven U.S. MRFs by The Recycling Partnership, residue made up 13.7 percent of outbound material, valued at minus 51.62 dollars per ton4. That is a small sample, not a national statistic.

Inbound composition sets the floor. The same report estimates U.S. national average inbound contamination of curbside recycling at 17 percent by weight4. A facility receiving 25 percent contaminated feed will never post the residue numbers of one receiving 12 percent†, so compare against plants with similar feed.

Screen efficiency

Screen separation feeds residue directly. Screen efficiency of 80 to 85 percent is typical, while well maintained and correctly loaded screens hold above 90 percent†.

A screen slipping from 90 to 80 percent pushes misplaced material to every downstream sorter and quietly inflates both residue and labor†.

How to measure

  • Divide residue tons by total outbound tons for the same period.
  • Measure screen efficiency on each screen every month.
  • Record inbound contamination beside each residue figure so like is compared with like.

What moves it

  • Cleaner inbound feed.
  • Screens that are well maintained and correctly loaded.
  • Fewer recoverables lost to residue, which the weekly residue audit tracks.

Check each screen with the Screen Efficiency calculator, and work out each sample's contamination share with the Contamination Rate calculator.

How to build your own baseline

  • Hold a daily downtime huddle on the previous day's stops.
  • Run contamination and recovery audits every week.
  • Score all six KPIs on a full monthly scorecard.
  • Compare against plants with similar inbound composition, not the best plant you know of.

Improve in this order

  • Availability first, because a point of uptime is pure throughput with no quality tradeoff.
  • Recovery second, since material already paid for should leave as product, not residue.
  • Purity third, which raises price per ton rather than tons.
  • Labor productivity and energy fourth, which compound the earlier gains.

For example, moving from 80 to 88 percent availability adds roughly 10 percent annual tons at the same rate, because 88 / 80 = 1.10.

Plants that run this cadence for 12 months typically move two of the six KPIs from the typical band into the top quartile; plants that only measure annually move none†.

Sources

  1. ReMA's ISRI Specifications (Guide for Nonferrous, Ferrous, Inbound Curbside Recyclables, Glass Cullet, Paper Stock, Plastic, Tires, Electronics), July 2026. Recycled Materials Association (ReMA, formerly ISRI). published July 2026. Guidelines for Paper Stock, grade (54) Mixed Paper (MP), printed p. 37 (PDF p. 42); definition of Outthrows, printed p. 34 (PDF p. 39). Accessed September 30, 2026.
  2. AMP Delta Compact Datasheet (belt-mounted robotic arm sortation). AMP Robotics Corp. (ampsortation.com). published 2024. p. 1 product summary; p. 2 'Performance Specifications' (Pick Rate). Accessed September 30, 2026.
  3. Table 1. Incidence rates of nonfatal occupational injuries and illnesses by industry and case types, 2024 (Survey of Occupational Injuries and Illnesses). U.S. Bureau of Labor Statistics. Table 1, rows 'Materials recovery facilities' (56292) and 'Manufacturing' (31-33), rates per 100 full-time workers. Accessed September 30, 2026.
  4. 2020 State of Curbside Recycling Report. The Recycling Partnership. published February 2020. Executive summary, p. iii (PDF p. 4); Curbside Contamination Rates, p. 21 (PDF p. 28); Figure 21 Sample of MRF Blended Values in the U.S., Oct 2019, p. 32 (PDF p. 39). Accessed September 30, 2026.
  5. ReMA's ISRI Specifications, July 2026: Plastic, PET Bottles (No PET Thermoforms). Recycled Materials Association (ReMA, formerly ISRI). published July 2026. Plastic specifications, 'PET Bottles (No PET Thermoforms)', PET Bale Grade chart, printed p. 41 (PDF p. 46). Accessed September 30, 2026.

Published 2026-07-02.