Market Wire

Manufacturing in Rhode Island Runs 28% Above the National Cost Average

Rhode Island's manufacturing cost index stands at 128.2 against a national 100 as of August 2026 — labor at 102.2 and industrial energy at 206.1. That places it 46th cheapest of 51 jurisdictions.

  • composite (US = 100): 128.2
  • labor: 102.2
  • industrial energy: 206.1

The composite weights labor at 75% and industrial electricity at 25%, so Rhode Island's position is mostly an energy story: its energy component indexes at 206.1 against the national 100. A premium of 28 points compounds differently across shops — a labor-heavy job shop feels the labor line, an energy-hungry process plant feels the kilowatt-hours.

For a site decision the index is the starting point, not the answer: freight to customers, workforce depth, and incentives move individual cases. The per-state page carries the underlying wage and electricity series this index is built from, both refreshed automatically.

Published 2026-11-02.