Market Wire

The Loonie Falls a Sixth Session to 1.43 per Dollar on November 13, 2026

The Loonie fell for a sixth straight session on November 13, 2026, reaching 1.43 per dollar. The rate is quoted in Canadian dollars per U.S. dollar, so a lower number means a stronger Canadian dollar.

consecutive declines: 6 sessions. from 1.40 per dollar after November 4, 2026 to 1.43 per dollar

The run began after November 4, 2026, when the rate stood at 1.40 per dollar — a 2.0% move in the rate over the streak.

A run this long changes how the next print reads: a rise would end a 6-session pattern and would be news in its own right, while a seventh consecutive decrease would extend one of the longer streaks in this archive. Source: Federal Reserve H.10 via FRED.

Published 2026-11-18.