Reshoring Signal
Batteries and storage cells: Reshoring Readiness
The Reshoring Readiness Index scores batteries and storage cells at 48.1 of 100 (building case), with a 15.47% observed effective calculated-duty rate.
The short answer
- Batteries and storage cells has an RRI of 48.1 of 100, a building case: the observed effective calculated-duty rate is 15.47% (tariff term 46/100), U.S. exports cover 29% of imports (dependence 71/100), and the named-source concentration floor is 2500 HHI (25/100). The score is down 12.6 points over the past year.
The three terms behind the score
- Tariff pressure 46/100 (45% weight): a 15.47% observed effective calculated-duty rate, level 52/100 with a one-year trend of 33/100.
- Import dependence 71/100 (30% weight): U.S. exports cover about 29% of imports.
- Sourcing concentration 25/100 (25% weight): 2500 on the complete-board Herfindahl index.
Frequently asked questions
- What is the reshoring readiness score for batteries and storage cells? 48.1 of 100 as of the latest month, a building case. The score combines tariff pressure (46/100), import dependence (71/100), and sourcing concentration (25/100) under the published RRI v2.0.0 methodology.
- Why does batteries and storage cells score this way? The observed effective calculated-duty rate is 15.47% in this family, U.S. exports cover about 29% of what it imports, and its retained-source Herfindahl index is 2500. Under this screening formula, a higher observed rate, deeper import dependence, and more concentrated sourcing raise the score; they do not establish plant-level profitability.
- Does a high score mean reshoring is profitable? No. The RRI is a screening indicator: it says the public trade data points that way, not that any specific plant pencils out. Validate with your own landed-cost, labor, and capacity numbers before deciding.
About this data
- A transparent screening indicator built from public USITC trade data, not sourcing advice. The tariff term uses an observed effective calculated-duty rate, not an entry-specific legal rate or cash-paid amount. Concentration is matched to the month's calendar year (latest completed year for newer months); import dependence is currently a latest-year snapshot applied across the series and will deepen into a true history as export years accumulate. The named-top-sources HHI is a floor. Validate any decision with your own landed-cost and capacity numbers.
Last reviewed 2026-10-08.